Skip to content
Structural & Durability Consulting Engineers
Technocrete
About
Capabilites
Design
Assessment
Consultancy
Projects
Design
Assessment
Consultancy
TechNotes
Contact
info@technocrete.com.au
+61 413 027 015
      
ASSESSMENT
Home
/
Projects
/
Assessment
All
Assessment
Bridges & Major Culverts
Bridges & Major Culverts
Buildings
Consultancy
Dams & Associated Structures
Design & Construct Collaboration
Design
Roads, Footpaths & Kerbs
Water & Wastewater Treatment Plants Infrastructures
Water Tanks, Towers & Reservoirs
Assessment of Barooga Water Treatment Plant
Repair Methodology of Barwidgee Creek Bridge
Assessment Of Finley Water Treatment Plant
Bondi Beach Building Structural Inspection
Circa 1936 Hotel Structural Assessment
Assessment & Modelling of 6 Bridges
Scientific Investigation of 8 Bridge Decks
Modelling & Upgrade Solutions of 16 Bridges
Inspection & Assessment of 62 Bridges
Assessment of Bay Creek Bridge
Bridge Strengthening & Wing Wall Design
Assessment of Barwidgee Creek Bridge
145km Kerb Assessment & Condition Rating
Inspection & Assessment of 90 Bridges
Assessment of 18 Bridges & Culverts
Wangaratta Water Tank & Reservoir Assessment
Assessment Of Post Tensioned Slab
Quality Assessment of Dam Spillway
Post-Fire Damage Inspection
Assessment of Net Ball Concrete Slab
Assessment Of Wodonga Racecourse Grandstand
Assessment & Repair Strategy of 5 Water Towers
Assessment of Plunkett's Bridge
Assessment of Dugay's Bridge
Assessment of Nestlé Concrete Water Tank
Crack Survey of Dam Spillway
Assessment of Buckland Bridge
Assessment of Lawrence St Bridge