Crack Survey of Dam Spillway

Crack Survey of Kangaroo Creek Dam Spillway Reinforced Concrete Wall & Carbonation Modelling To Predict The Residual Service Life

Project Scope

Inspection, Survey, and Assessment of Heavily Cracked Dam Spillway Reinforced Concrete Wall

The following tasks were carried out:

  • Detailed Inspection of the Reinforced Concrete Wall
  • Selected 25 Cracks for investigation
  • Measurement of all dimensions of Selected Cracks including Length, Width, and Depth
  • Measuring the Depth of the Cracks utilising Ultrasonic Technology in accordance with BS 1881: Part 203
  • Investigating the Effect of the Cracks on Service Life of the Structure through Mathematical Modelling
  • Providing Recommendations for the Next Step of Investigation before Repairing of the Cracks

Project Ref. No. : TC19-P116

Client : South Australia Water

Completion Date : 19–March–2019