Level 2 Bridge Inspection, Condition Assessment, Lead & Asbestos Content Sampling, & Repair Methodology
Project Scope
Level 2 inspection and condition assessment of the Barwidgee Creek Rail Trail Bridge. The scope of the project is presented as follows:
- Assess structural condition of bridge components
- Identifying any defects and damages that affect the structural integrity of the bridge
- Remediation recommendations with prioritising the repair operations
- Sampling, testing, and identification of existing coating materials regarding Lead and Asbestos content
- A condition report including photographs specially form defects.