Wangaratta Water Tank & Reservoir Assessment

Inspection & Assessment, Structural Modelling, and Analysis & Assessment of Wangaratta Kerr St. Water Storage Tank & Reservoir

Project Scope

Inspection & assessment, structural modelling, and analysis for Wangaratta Kerr St. Water Tank and Reservoir.

The following tasks were successfully delivered:

  • Detailed Visual Inspection of Internal and External Concrete Wall and Slab
  • Vast Range of NDT
  • Structural FE Modelling, Analysis and Assessment of the Load Bearing Capacity of the Reservoir
  • Durability Assessment of the Structure
  • Repair Strategy and Specification
  • Cost Analysis for Repair Operations

Project Ref. No. : TC21-P258

Client : North East Water

Completion Date : 28–Jul–2021