Skip to content
Structural & Durability Consulting Engineers
Technocrete
About
Capabilites
Design
Assessment
Consultancy
Projects
Design
Assessment
Consultancy
TechNotes
Contact
info@technocrete.com.au
+61 413 027 015
      
ASSESSMENT
Home
/
Projects
/
Assessment
All
Assessment
Bridges & Major Culverts
Bridges & Major Culverts
Buildings
Consultancy
Dams & Associated Structures
Design & Construct Collaboration
Design
Roads, Footpaths & Kerbs
Water & Wastewater Treatment Plants Infrastructures
Water Tanks, Towers & Reservoirs
Bondi Beach Building Structural Inspection
Wangaratta Water Tank & Reservoir Assessment
Post-Fire Damage Inspection
Bridge Strengthening & Wing Wall Design
Assessment & Repair Strategy of 5 Water Towers
Assessment Of Post Tensioned Slab
Assessment of Barooga Water Treatment Plant
Assessment of Plunkett's Bridge
Assessment of Dugay's Bridge
Inspection & Assessment of 90 Bridges
Assessment of Lawrence St Bridge
Assessment of Net Ball Concrete Slab
Assessment of Buckland Bridge
Inspection & Assessment of 62 Bridges
Modelling & Upgrade Solutions of 16 Bridges
145km Kerb Assessment & Condition Rating
Assessment of 18 Bridges & Culverts
Assessment of Barwidgee Creek Bridge
Assessment of Bay Creek Bridge
Assessment & Modelling of 6 Bridges
Quality Assessment of Dam Spillway
Assessment Of Wodonga Racecourse Grandstand
Assessment of Nestlé Concrete Water Tank
Crack Survey of Dam Spillway
Repair Methodology of Barwidgee Creek Bridge
Circa 1936 Hotel Structural Assessment
Scientific Investigation of 8 Bridge Decks
Assessment Of Finley Water Treatment Plant