Structural Strengthening Repair Design For Ash’s Bridge
Project Scope
Design and deliver detailed drawings of concept to reinstate the load rating of Ash’s Bridge in order to extend the service life.
The following tasks were delivered successfully:
- Structural analysis
- Concept design for rehabilitation operations to extend service life by 10 years
- Delivery of design and drawings