Repair Strategy, Structural Strengthening Design, and Associated Cost of Goynes Road Bridge
Project Scope
The following tasks were successfully delivered:
- Structural Modelling, Analysis, and Assessment
- Load Bearing Capacity (Load Rating Factor)
- Structural Strengthening Design to upgrade the Load Capacity of the Bridge for two Load Condition of 42.5t and 62.5t.
- Structural Drawings for Construction
- Repair Design & Specification for Bridge Barrier, Kerb, Shear Keys
- Cost Analysis for Repair and Strengthening Operations