Structural & Durability Assessment of Turbine Tail Bay (Power Station)
Clover Power Station, VIC- Project Ref. No.:TC23-P363
- Client: AGL Energy
- Completion Date: 2023
PROJECT SCOPE:
- Assess the structural and durability condition of the tail bay concrete structure, considering its age, exposure to soft water in the basin, and temperature variations from wetting and drying cycles.
- Conduct Non-Destructive Testing (NDT) and selected Destructive Testing (DT) techniques, including:
- Ultrasonic Pulse Velocity (UPV) – to evaluate concrete uniformity and detect defects.
- Rebound Hammer (RH) – for surface hardness and compressive strength estimation.
- Steel Reinforcement Corrosion Monitoring (SRCM) – to assess reinforcement corrosion potential.
- Select and test two representative areas of the structure:
- Wall “W1” – structural wall section.
- Ground “G1” – slab/floor section.
- Analyse the collected data to determine overall concrete condition, structural integrity, and durability performance.
Completed Projects
Blowering Dam Dividing Wall Safety Review and Temporary Bulk Gate Design
Blowering Dam Access Road, Wereboldera, NSW
Comprehensive Level 3 Structural Inspection, NDT, Modelling, Load Rating, and Repair Strategy for 56 Bridges and Major Culverts
Queensland Outback – Boulia, Winton, Longreach, Jundah, Blackall, QLD
Detailed Structural and Durability Assessment, Repair Strategy, Repair Tender Preparation for Griffith Water Treatment Plant
Griffith, NSW
Durability and Design Life Compliance Review and Advisory Report of Reinforced Concrete Slabs
Aquinas College Basketball Courts, 46 Great Ryrie Street, Ringwood, VIC
Inspection, Condition Assessment, Modelling, and Design Control of an 11 ML Concrete Water Tank
Kerr St, Wangaratta, VIC
Inspection, Non-Destructive Testing (NDT), and Structural Assessment of Beechworth Swimming Pool
Beechworth Swimming Pool, Beechworth VIC
Level 2 Visual Inspection, Condition Assessment, Load Rating, and Drawing Preparation for 182 Bridges and Major Culverts
Wodonga, VIC
Level 3 Inspection, NDT, Structural Assessment, and Repair Design with Cost Estimation of 6-Span Composite Steel Girder Road Bridge
Wodonga, VIC
Level 3 Inspection, NDT, Structural Assessment, and Repair Design with Cost Estimation of 6-Span Composite Steel Girder Road Bridge
Athole Road Bridge, NSW
Level 3 Inspection, Non-Destructive Testing (NDT), Structural and Durability Assessment of Three Sewage Pump Stations, Including Repair Design
Griffith, NSW
Structural and Material Quality Assessment of Dam Spillway Concrete Slab Using Tomographic Survey
Kangaroo Creek Dam, SA